Manufacture (plan feature): define Bill Of Material at `/definitions/bom`, run Manufacture Orders at `/definitions/manufacture-order` with Start Manufacturing, and review Material Consumption and Production Cost reports. Finished products can show average manufacture cost on the Item Product Cost tab.

Reports

Material Consumption & Production Cost

After Start Manufacturing, use Material Consumption (Planned vs Actual vs Variance) and Production Cost (Material, Labor, Overhead, Cost Per Unit). Finished items with a manufacture plan also show Product Cost on the Item.

Material Consumption

  • Planned — quantities expected from the BOM × manufacture qty
  • Actual — quantities confirmed when you Start Manufacturing
  • Variance — difference between planned and actual for each material
  • Use variance to tighten BOM recipes or warehouse discipline

Product screenshot coming soon

Material Consumption is the production usage ledger for raw materials against manufacture runs.

Production Cost

  • Material — cost of confirmed raw materials
  • Labor — labor entered on Start Manufacturing
  • Overhead — overhead entered on Start Manufacturing
  • Cost Per Unit — total production cost divided by finish quantity
  • Product Cost tab on Finished items with a manufacture plan — see Average cost after production

Product screenshot coming soon

Production Cost rolls material plus labor and overhead into a unit cost for the finished product.

How to use the numbers

P

Planned

Baseline from BOM — should match theory for the order qty.

A

Actual

What was confirmed on Start — drives true material cost.

Δ

Variance

Investigate scrap, theft, or wrong BOM qty when gaps grow.

Cost / unit

Compare runs and update pricing using Product Cost on Item.

Tip

Open the finished product under Item → Product Cost after several manufacture runs to see Average cost. Full link between manufacture plan and Item is covered in Finished Product & Product Cost.

Frequently asked

Why is variance always zero?+

You confirmed materials exactly as planned. That is fine — variance appears when actual confirmation differs from BOM-scaled quantities.

Where else do I see production cost?+

On Finished Product items with a manufacture plan — Product Cost tab shows Average cost. See Item.